Microcement for hotels
Corridors, lobbies, bedroom floors, en suites and public bathrooms, done floor by floor so the hotel keeps trading.
5.0 ★★★★★
No grout means nothing to discolour across dozens of bathrooms.
The argument is usually the en suites. A seamless floor and shower is quicker for housekeeping to clean than tiles, and it reads the same in room 101 as in room 412. Lobbies and corridors take the heaviest traffic, so they get a harder system and a sealer specified for wear.
Where microcement works in a hotel
Lobbies and reception
The heaviest foot traffic in the building. OnePox with a sealer for wear.
Corridors
Done in sections or floor by floor, so rooms stay sellable.
En suites
Walls, floor and shower in one surface, tanked before any finish.
Public bathrooms
No grout lines to hold dirt, and quick to clean.
What decides a hotel microcement specification
Traffic
Lobby and corridor floors need a harder system than a bedroom.
Water
Every shower zone is tanked first. The finish is not the waterproofing.
Programme
Rooms out of service is lost revenue, so we plan zone by zone.
Microcement for hotels: how a refurbishment runs
We work floor by floor, or section by section, so the hotel keeps trading. A typical programme tanks and finishes a block of bathrooms or a corridor section, hands it back for cleaning and inspection, and moves on, so rooms return to sale as each section is done. We agree the programme with your operations team before we start, including noise hours, access routes and where materials are stored.
We work in hotels across Ireland, with Dublin work routine and Cork, Galway and Limerick taken where the programme allows a continuous run on site.
Microcement hotel floors and bathrooms: what the specification covers
Lobby and corridor floors take the heaviest traffic and wheeled luggage, so they get a harder system and a sealer specified for wear. En suite floors and showers are tanked first, with slip resistance specified for wet areas. Public bathrooms and spa areas follow the same logic. We provide a specification per zone, the manufacturer's data sheets and sample panels for sign-off before we start.
FAQ
Hotel microcement questions
Can microcement be done while the hotel stays open?
Yes, in sections. We work floor by floor, corridor by corridor or block by block, agree the programme with your operations team and hand each section back before moving on, so rooms stay sellable. Curing sets the pace, so the programme has to allow for it.
Is microcement suitable for hotel corridors and lobbies?
Yes, on the right system. Lobbies and corridors take the heaviest traffic, luggage and cleaning machines, so they get a harder system and a sealer specified for wear. We specify per zone, not one build-up for the whole hotel.
Is microcement suitable for hotel bathrooms and en suites?
Yes. Walls, floor and shower are done in one surface, tanked before any finish goes on, with slip resistance specified for wet areas. With no grout, there is nothing to discolour across dozens of bathrooms, and housekeeping cleans them faster.
How long does it take to refurbish hotel rooms?
It depends on the number of rooms and the programme. Per room, the finishing and curing run to a fixed schedule, so we plan the number of rooms per week with you, rather than quote a single duration.